Investigate savings opportunities on a 'no cure, no pay' basis. CTB was keen to seize this opportunity. "We can only benefit from this," said controller Bas Witjes. And that is exactly what happened. The assignment to ERA Group resulted in savings of 19% for the vehicle fleet.
"We are extremely satisfied with ERA Group's approach: thorough preparatory work, direct lines of communication, quick responses to questions, and a short turnaround time. The project required little effort on our part and the results are impressive!" [Bas Witjes - Controller CTB]
CTB achieves a 19% reduction in fleet costs; leasing and insurance provisions are now independently procured via alternative suppliers.
Download the CTB Case Study